Gold Production – Gold production for the March quarter was 32,074 ounces.

  • Costs – Cash costs for the March quarter were US$721 per ounce. All-in Sustaining Costs (“AISC”)* for the March quarter were US$902 per ounce.
  • 2016 Mine Plan – The March quarter is tracking above the overall 2016 Mine Plan with the total material moved 32% above March 2015 quarter. A budgeted higher strip ratio is evident this quarter associated with cutbacks at AB1, AB2 and Duckhead. The cutbacks will enable access and production of higher grade ores in the second half of 2016 as planned.
  • More