Beadell Resources Limited (“Beadell” or “the Company”) is pleased to announce that open pit mining and processing of the ultra high grade Duckhead gold deposit at the Company’s Tucano gold mine in Brazil is progressing extremely well with a significant ramp up in gold production under way.
The Duckhead ore is now having a material impact on gold production at Tucano with 800 ounces per day of gold being recovered on average over the last 10 days. Mill throughput over the same period has been 12,000 dry tonnes per day with recoveries averaging 93.5%.

Lovely Hampton's Inspired Spacious